Yeah, I put 2 runs of #5 rebar and 2 runs of #4 rebar on 6" centers, one run 1' from the bottom and the next run 6" above that one in the footer plus 7 rolls of the heavy duty roll mesh wire tied into the rebar. If he had come out the next day like he should and cut his lines, there would have been far less cracks than is in there now if any that would be visible. Plus the fiber helps.
The pad where the old building was, was basically the same size and was poured 20 years before and didn't have but one small crack at the corner of the big door at the front of the building. But that was poured by the old guy that used to own this company before he turned it over to one of his boys.
The pad where the old building was, was basically the same size and was poured 20 years before and didn't have but one small crack at the corner of the big door at the front of the building. But that was poured by the old guy that used to own this company before he turned it over to one of his boys.