AZ ranch

   / AZ ranch
  • Thread Starter
#1,381  
IMG_1345.jpeg


I went ahead and put perforated drain pipe behind the block I have done so far.
I know, some think I’m nuts for doing the drain pipe when I haven’t even finished the first course yet, but I’ve had multiple cave-ins and I’m just trying to make sure I can get some wall up asap by the most susceptible area to cave.
I even have the apron area to pour yet. That’s the section with all the pieces of rebar.
 
   / AZ ranch #1,383  
I just now found my tool for smoothing the seam between blocks. I may not use it until the 5th course as everything below that will be covered in dirt, inside and out.
A small kitchen spoon works good as well.
You know you’ll misplace it again before course 5!!
 
   / AZ ranch
  • Thread Starter
#1,390  
About 12 block a day is what my back will tolerate. Then there’s tarring the outside and hauling/washing gravel for backfill, grinding and placing rebar, etc. The actual laying of block is about 25% of the job, so I’m happy with the progress rate.
 

Tractor & Equipment Auctions

2012 Chrysler Town and Country (A47477)
2012 Chrysler Town...
377789 (A51573)
377789 (A51573)
CASE 580 (A47477)
CASE 580 (A47477)
2017 Freightliner M2 106 T/A 4,000 Gallon Water Truck (A55788)
2017 Freightliner...
King Kutter TG72 Rotary Tiller Tractor Attachment (A55851)
King Kutter TG72...
2016 FREIGHTLINER CASCADIA SLEEPER (A56129)
2016 FREIGHTLINER...
 
Top