AZ ranch

   / AZ ranch
  • Thread Starter
#1,381  
IMG_1345.jpeg


I went ahead and put perforated drain pipe behind the block I have done so far.
I know, some think I’m nuts for doing the drain pipe when I haven’t even finished the first course yet, but I’ve had multiple cave-ins and I’m just trying to make sure I can get some wall up asap by the most susceptible area to cave.
I even have the apron area to pour yet. That’s the section with all the pieces of rebar.
 
   / AZ ranch #1,383  
I just now found my tool for smoothing the seam between blocks. I may not use it until the 5th course as everything below that will be covered in dirt, inside and out.
A small kitchen spoon works good as well.
You know you’ll misplace it again before course 5!!
 
   / AZ ranch
  • Thread Starter
#1,390  
About 12 block a day is what my back will tolerate. Then there’s tarring the outside and hauling/washing gravel for backfill, grinding and placing rebar, etc. The actual laying of block is about 25% of the job, so I’m happy with the progress rate.
 

Tractor & Equipment Auctions

1995 Rinker Captiva 190 (A56435)
1995 Rinker...
2013 Ford F-150 Pickup Truck (A56858)
2013 Ford F-150...
1996 Timpte 46ft Hopper (A56436)
1996 Timpte 46ft...
2022 Horizon Trailer (A55973)
2022 Horizon...
2012 DODGE RAM 5500 FLATBED (A58214)
2012 DODGE RAM...
Auger Drill Bit (A56857)
Auger Drill Bit...
 
Top