I went ahead and put perforated drain pipe behind the block I have done so far.
I know, some think I’m nuts for doing the drain pipe when I haven’t even finished the first course yet, but I’ve had multiple cave-ins and I’m just trying to make sure I can get some wall up asap by the most susceptible area to cave.
I even have the apron area to pour yet. That’s the section with all the pieces of rebar.
 
   / AZ ranch #1,383  
I just now found my tool for smoothing the seam between blocks. I may not use it until the 5th course as everything below that will be covered in dirt, inside and out.
A small kitchen spoon works good as well.
You know you’ll misplace it again before course 5!!
 
   / AZ ranch
  • Thread Starter
#1,390  
About 12 block a day is what my back will tolerate. Then there’s tarring the outside and hauling/washing gravel for backfill, grinding and placing rebar, etc. The actual laying of block is about 25% of the job, so I’m happy with the progress rate.
 

Tractor & Equipment Auctions

New/Unused SD Lanch 20x20 Carport (A57454)
New/Unused SD...
2000 Nabors 40 Ton T/A Flatbed Equipment Trailer (A55973)
2000 Nabors 40 Ton...
Dorsey 4th Axle, Dual Axle, Air Brakes (A59076)
Dorsey 4th Axle...
2025 Kivel Forks and Frame Mini Skid Steer Attachment (A55787)
2025 Kivel Forks...
2019 Kohler 50REOZK 50 kW Diesel Generator (A56857)
2019 Kohler...
2009 INTERNATIONAL DURASTAR 4300 SBA ROAD TRACTOR (A58375)
2009 INTERNATIONAL...
 
Top