I went ahead and put perforated drain pipe behind the block I have done so far.
I know, some think I’m nuts for doing the drain pipe when I haven’t even finished the first course yet, but I’ve had multiple cave-ins and I’m just trying to make sure I can get some wall up asap by the most susceptible area to cave.
I even have the apron area to pour yet. That’s the section with all the pieces of rebar.
 
   / AZ ranch #1,383  
I just now found my tool for smoothing the seam between blocks. I may not use it until the 5th course as everything below that will be covered in dirt, inside and out.
A small kitchen spoon works good as well.
You know you’ll misplace it again before course 5!!
 
   / AZ ranch
  • Thread Starter
#1,390  
About 12 block a day is what my back will tolerate. Then there’s tarring the outside and hauling/washing gravel for backfill, grinding and placing rebar, etc. The actual laying of block is about 25% of the job, so I’m happy with the progress rate.
 

Tractor & Equipment Auctions

15200 (A56857)
15200 (A56857)
Hyster H80FT 8,000LB Forklift (A56857)
Hyster H80FT...
2025 Wolverine MAD-12-12D Auger Mini Skid Steer Attachment (A56857)
2025 Wolverine...
LOT: (6) Ratcheting Chain Binders (A59076)
LOT: (6)...
Willmar Wrangler 4500 (A56435)
Willmar Wrangler...
EZ-GO Utility Cart (A55851)
EZ-GO Utility Cart...
 
Top