I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Marketplace Items

2019 CATERPILLAR D6K2 LGP CRAWLER DOZER (A60429)
2019 CATERPILLAR...
2019 Dodge Durango AWD SUV (A59231)
2019 Dodge Durango...
2019 F-550 Bucket Truck (A61306)
2019 F-550 Bucket...
TEST YOUR BID BUTTON! (A60430)
TEST YOUR BID...
JCB 509-23TC TOOL CARRIER TELESCOPIC FORKLIFT (A60429)
JCB 509-23TC TOOL...
2018 Kubota U17 (A53317)
2018 Kubota U17...
 
Top