Well House Load Center??

/ Well House Load Center?? #21  
I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Marketplace Items

2022 DODGE RAM 3500 FLATBED (A63569)
2022 DODGE RAM...
2019 KENWORTH T680 6X4 T/A SLEEPER TRUCK TRACTOR (A59910)
2019 KENWORTH T680...
2018 FREIGHTLINER CASCADIA 125 6X4 T/A DAY CAB TRUCK TRACTOR (A59910)
2018 FREIGHTLINER...
2021 PETERBILT 388 6X4 T/A SLEEPER TRUCK TRACTOR (A59911)
2021 PETERBILT 388...
2003 Chevrolet Kodiak C4500 Flatbed 503372 (A62613)
2003 Chevrolet...
John Deere 4520 (A60462)
John Deere 4520...
 
Top