Well House Load Center??

   / Well House Load Center?? #21  
I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Tractor & Equipment Auctions

DRILL CABINET SKID (A58214)
DRILL CABINET SKID...
2008 CAT D6T DOZER (A58214)
2008 CAT D6T DOZER...
Toro Sand Pro (A56859)
Toro Sand Pro (A56859)
SEMI AUTOMATIC QUICK CHANGE FOR MINI EXCAVATOR (A58214)
SEMI AUTOMATIC...
30 INCH TOOTHLESS BUCKET FOR MINI EXCAVATOR (A58214)
30 INCH TOOTHLESS...
RIPPER ATTACHMENT FOR MINI EXCAVATOR (A58214)
RIPPER ATTACHMENT...
 
Top