Well House Load Center??

/ Well House Load Center?? #21  
I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Marketplace Items

CATERPILLAR TL1055D TELESCOPIC FORKLIFT (A64279)
CATERPILLAR...
2015 Ford Taurus AWD Sedan (A61574)
2015 Ford Taurus...
2020 FREIGHTLINER CASCADIA SLEEPER TRUCK (A59910)
2020 FREIGHTLINER...
LMC 2-Row Planter BYJ-2F  Stainless Steel Fertilizer Boxes, Ground-Driven (A61307)
LMC 2-Row Planter...
2018 MACK CXU (PINNACLE) (A63569)
2018 MACK CXU...
2020 TROXELL CONCEPT 130 BBL STEEL VACUUM TRAILER (A63569)
2020 TROXELL...
 
Top