Well House Load Center??

/ Well House Load Center?? #21  
I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Marketplace Items

2017 FREIGHTLINER CASCADIA 125 6X4 T/A SLEEPER TRUCK TRACTOR (A59911)
2017 FREIGHTLINER...
7102 (A61567)
7102 (A61567)
2022 Ram ProMaster 2500 Cargo Van (A61573)
2022 Ram ProMaster...
iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A59228)
iDrive TDS-2010H...
2017 Nissan Altima 4 door (A63689)
2017 Nissan Altima...
2015 Nissan Leaf Hatchback (A61574)
2015 Nissan Leaf...
 
Top