Well House Load Center??

   / Well House Load Center?? #21  
I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Tractor & Equipment Auctions

2014 JOHN DEERE  544K WHEEL LOADER (A58214)
2014 JOHN DEERE...
2016 Kubota SVL75-2 (A53317)
2016 Kubota...
2018 JLG 742 TELESCOPIC FORKLIFT (A60429)
2018 JLG 742...
207271 (A52708)
207271 (A52708)
54in Loader Fork Attachment (A59228)
54in Loader Fork...
500 BBL FRAC TANK (A58214)
500 BBL FRAC TANK...
 
Top