I'd agree with you on the NEC and grounding, but that's probably a sit around the stove and chat all winter item.

I'm not an NEC expert, but always happy to learn. Is that rule for sub panels in the same building? I.e. a well pump panel would be a different building, and therefore need a ground? (What is the section, or sections, that apply for that?)

All the best,

Peter
The old code was that each outbuilding sub panel was considered a separate electrical service. My wood shed is wired with a separate ground. The well pump was once wired with a separate ground, but the old underground feeder died and I'm running a new service from the shop.
 

Tractor & Equipment Auctions

New/Unused CFG Industrial H15R Mini Excavator (A57453)
New/Unused CFG...
NEW Landhonor LHR=EPC40 Plasma Cutter (A59000)
NEW Landhonor...
JOHN DEERE 12' BOX SCRAPE (A52708)
JOHN DEERE 12' BOX...
SIMIRON SV3 HD VACUUM (A58374)
SIMIRON SV3 HD...
2006 JCB 520 Telehandler (A59213)
2006 JCB 520...
JOHN DEERE 544K WHEEL LOADER (A52709)
JOHN DEERE 544K...
 
Top