Finally got the bridge started.

   / Finally got the bridge started.
  • Thread Starter
#21  
I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
   / Finally got the bridge started. #24  
Awesome job. Looks great!
 
   / Finally got the bridge started. #25  
Nicely done.
 
   / Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Tractor & Equipment Auctions

2020 JLG 1732 16,755lb 4x4 High-Capacity Rough Terrain Telehandler (A49461)
2020 JLG 1732...
1993 Harsh Feed Mixer (A51039)
1993 Harsh Feed...
2019 CATERPILLAR 289D SKID STEER (A51242)
2019 CATERPILLAR...
2017 Ford F-550 Ext. Cab Valve Maintenance Truck (A50323)
2017 Ford F-550...
2019 CATERPILLAR D5K2 LGP CRAWLER DOZER (A51242)
2019 CATERPILLAR...
MAXUM 1000 TRIPLEX PUMP POWERED BY 3412 CATERPILLAR ENGINE (A50854)
MAXUM 1000 TRIPLEX...
 
Top