I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
/ Finally got the bridge started. #24  
Awesome job. Looks great!
 
/ Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Marketplace Items

CATERPILLAR CB24B DOUBLE DRUM ROLLER (A52707)
CATERPILLAR CB24B...
KUBOTA RTV900 UTV (A62130)
KUBOTA RTV900 UTV...
2012 Ford F-250 Pickup Truck (A59230)
2012 Ford F-250...
Bush Hog 3pt 14' Mower (A53317)
Bush Hog 3pt 14'...
Toro z turn (A56859)
Toro z turn (A56859)
Zero Turn Mower (A59231)
Zero Turn Mower...
 
Top