Finally got the bridge started.

   / Finally got the bridge started.
  • Thread Starter
#21  
I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
   / Finally got the bridge started. #24  
Awesome job. Looks great!
 
   / Finally got the bridge started. #25  
Nicely done.
 
   / Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Tractor & Equipment Auctions

Charlotte County (A50323)
Charlotte County...
2019 John Deere 5090E (A53314)
2019 John Deere...
MULTIQUIP WHISPERWATT MQ POWER 25 GENERATOR (A52706)
MULTIQUIP...
Year: 2009 Make: Freightliner Model: B2 Vehicle Type: Bus Mileage: 279,016 Plate: Body Type: (A55852)
Year: 2009 Make...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
New/Unused 2 Post Car Lift (A54865)
New/Unused 2 Post...
 
Top