I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
/ Finally got the bridge started. #24  
Awesome job. Looks great!
 
/ Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Marketplace Items

2015 Peterbilt 389 T/A Sleeper Cab Truck Tractor (A56858)
2015 Peterbilt 389...
CONCORD CRE96018B CONVEYOR BELT (A52706)
CONCORD CRE96018B...
2019 PJ TRAILER 32FT GOOSENECK (A58214)
2019 PJ TRAILER...
2025 14ft. Bi-Parting Driveway Gate (A59231)
2025 14ft...
2007 DELTA GOOSENECK TRAILER (A58214)
2007 DELTA...
2006 Formula 292 Boat with T/A Trailer (A59231)
2006 Formula 292...
 
Top