Finally got the bridge started.

/ Finally got the bridge started.
  • Thread Starter
#21  
I was able to get one side of the bridges railings done. I miscalculated the amount of boards I was going to need so I had to mill up more boards. Which I now have to wait until they dry out a bit. Anyway, here are some pics. The first two pics are before I stained them, the second 2 pics are with the 50/50 used oil and diesel mix.

20230919_144951.jpg


20230919_144925.jpg


20230919_162002.jpg


20230919_162016.jpg
 
/ Finally got the bridge started. #24  
Awesome job. Looks great!
 
/ Finally got the bridge started.
  • Thread Starter
#26  
Thanks for all the replies. I didn’t want to just put up run of the mill balusters to support the handrails. I was looking for something functional and had some character. Also, the wife wanted something to keep the grandkids from falling off. This is what I came up with.
 

Marketplace Items

2019 Krause 8005-30 Excelerator - High Speed Vertical Tillage - 30 FT Working Width (A61307)
2019 Krause...
5' ROTARY MOWER (A52706)
5' ROTARY MOWER...
2005 Chevrolet Impala Sedan (A56859)
2005 Chevrolet...
2016 Chevrolet Silverado 1500 4x4 Crew Cab Pickup Truck (A59230)
2016 Chevrolet...
2020 PETERBILT 579 TANDEM AXLE SLEEPER (A59905)
2020 PETERBILT 579...
2005 Nissan Frontier Crew Cab Pickup Truck (A59230)
2005 Nissan...
 
Top