dave1949
Super Star Member
15F & snow shower, less than 1" expected. Could see mid-20's later today.
Here's the new cabinets hiding the mini-split lines. For back-fitting I think we did a reasonable job of covering things up. Would have been better if it was planned during construction, but that's life.
Above the frig. A blank space on the left for the refrigerant lines going up into the attic. The condensate drain is on the other side of the wall behind the frig which is the laundry room. It goes to waste line clean out like in the pic below but no need to hide that one.

In the corner of the bathroom with the refrigerant lines going up into the attic and condensate drain going down to a waste line clean out. The cabinet has removable side panels on the clean out side if a snake would ever be needed.

Here's the new cabinets hiding the mini-split lines. For back-fitting I think we did a reasonable job of covering things up. Would have been better if it was planned during construction, but that's life.
Above the frig. A blank space on the left for the refrigerant lines going up into the attic. The condensate drain is on the other side of the wall behind the frig which is the laundry room. It goes to waste line clean out like in the pic below but no need to hide that one.

In the corner of the bathroom with the refrigerant lines going up into the attic and condensate drain going down to a waste line clean out. The cabinet has removable side panels on the clean out side if a snake would ever be needed.
