Fired Morton Bldg-Need another builder

   / Fired Morton Bldg-Need another builder #11  
The crew that built my house and shop are booked 2 years out. And worth the wait.
 
   / Fired Morton Bldg-Need another builder #12  
I built my 40x60x14 pole barn while remote (~300 miles, so a bit less than you). I found it very valuable to make local contacts and gain referrals from them. The pole building contractor built for a couple of my contacts, I did all the DWV excavation and plumbing for septic and excavation for water line, electrical contractor was another referral, I did the trenching and conduit for power to meter as well as prepping for the transformer pad, insulation for walls I did myself as well as installing OSB as my finish for walls, ceiling was insulated by another referral, HVAC and plumbing was a DYI job. Inspections were either coordinated by the appropriate contractor or myself, depending.

Needless to say it took me a little over 2 years to get to the almost finished state that I’m at now working on weekends and vacations.
 

Tractor & Equipment Auctions

2007 Yamaha Rhino 660 (A56438)
2007 Yamaha Rhino...
Enmark Z Spray (A53316)
Enmark Z Spray...
2019 Chevrolet Tahoe SUV (A59231)
2019 Chevrolet...
2021 Ver-Mac PCMS-3812 Solar S/A Towable Trailer Message Board (A55973)
2021 Ver-Mac...
2015 CATERPILLAR  XQ30 GENERATOR (A58214)
2015 CATERPILLAR...
60'' SKID STEER BUCKET (A56857)
60'' SKID STEER...
 
Top