Fired Morton Bldg-Need another builder

   / Fired Morton Bldg-Need another builder #11  
The crew that built my house and shop are booked 2 years out. And worth the wait.
 
   / Fired Morton Bldg-Need another builder #12  
I built my 40x60x14 pole barn while remote (~300 miles, so a bit less than you). I found it very valuable to make local contacts and gain referrals from them. The pole building contractor built for a couple of my contacts, I did all the DWV excavation and plumbing for septic and excavation for water line, electrical contractor was another referral, I did the trenching and conduit for power to meter as well as prepping for the transformer pad, insulation for walls I did myself as well as installing OSB as my finish for walls, ceiling was insulated by another referral, HVAC and plumbing was a DYI job. Inspections were either coordinated by the appropriate contractor or myself, depending.

Needless to say it took me a little over 2 years to get to the almost finished state that I’m at now working on weekends and vacations.
 

Tractor & Equipment Auctions

1973 POWER 30ft Pole S/A Towable Trailer (A48081)
1973 POWER 30ft...
Kubota SVL95-2 High Flow Cab Skid Steer (A51039)
Kubota SVL95-2...
2020 Chevrolet Malibu LT Sedan (A50860)
2020 Chevrolet...
2007 Mcclain Utility Trailer (A50860)
2007 Mcclain...
2017 Harley-Davidson FLHTP Police Electra Glide Motorcycle (A49461)
2017...
2025 K4525G UNUSED Double Garage Steel Barn (A50860)
2025 K4525G UNUSED...
 
Top