Fired Morton Bldg-Need another builder

   / Fired Morton Bldg-Need another builder #11  
The crew that built my house and shop are booked 2 years out. And worth the wait.
 
   / Fired Morton Bldg-Need another builder #12  
I built my 40x60x14 pole barn while remote (~300 miles, so a bit less than you). I found it very valuable to make local contacts and gain referrals from them. The pole building contractor built for a couple of my contacts, I did all the DWV excavation and plumbing for septic and excavation for water line, electrical contractor was another referral, I did the trenching and conduit for power to meter as well as prepping for the transformer pad, insulation for walls I did myself as well as installing OSB as my finish for walls, ceiling was insulated by another referral, HVAC and plumbing was a DYI job. Inspections were either coordinated by the appropriate contractor or myself, depending.

Needless to say it took me a little over 2 years to get to the almost finished state that I’m at now working on weekends and vacations.
 

Tractor & Equipment Auctions

Deere 35G (A53317)
Deere 35G (A53317)
2022 Vermeer 573 (A55973)
2022 Vermeer 573...
2017 CAT 315F LCR EXCAVATOR (A58214)
2017 CAT 315F LCR...
2008 MAXX-D FUEL TRAILER (A58214)
2008 MAXX-D FUEL...
2013 COACHMEN CATALINA TRAVEL TRAILER (A55745)
2013 COACHMEN...
2018 ARIENS RIDING MOWER (A56859)
2018 ARIENS RIDING...
 
Top