Fired Morton Bldg-Need another builder

/ Fired Morton Bldg-Need another builder #11  
The crew that built my house and shop are booked 2 years out. And worth the wait.
 
/ Fired Morton Bldg-Need another builder #12  
I built my 40x60x14 pole barn while remote (~300 miles, so a bit less than you). I found it very valuable to make local contacts and gain referrals from them. The pole building contractor built for a couple of my contacts, I did all the DWV excavation and plumbing for septic and excavation for water line, electrical contractor was another referral, I did the trenching and conduit for power to meter as well as prepping for the transformer pad, insulation for walls I did myself as well as installing OSB as my finish for walls, ceiling was insulated by another referral, HVAC and plumbing was a DYI job. Inspections were either coordinated by the appropriate contractor or myself, depending.

Needless to say it took me a little over 2 years to get to the almost finished state that I’m at now working on weekends and vacations.
 

Marketplace Items

OVERLAND VACUUM TANK (A60736)
OVERLAND VACUUM...
(INOPERABLE) DYNAPAC DOUBLE DRUM ROLLER (A58214)
(INOPERABLE)...
2012 DRAGON 130BBL VAC TRAILER (A58214)
2012 DRAGON 130BBL...
Hardee Tiger SH-360-CO (A60462)
Hardee Tiger...
2020 MACK GRANITE (A60736)
2020 MACK GRANITE...
2014 Freightliner Bucket Truck (A56438)
2014 Freightliner...
 
Top