Building a covered work area with a 40' span, will this work?

   / Building a covered work area with a 40' span, will this work? #51  
The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

2022 Quick Attach Brush Buster - Heavy-Duty Skid Steer Cutter for Brush and Overgrowth (A53473)
2022 Quick Attach...
2019 CATERPILLAR D6T LGP HI TRACK CRAWLER DOZER (A52705)
2019 CATERPILLAR...
2001 KINCAID PRO-SERIES 1200V2 HYDRO SEEDER (A51406)
2001 KINCAID...
HYSTER H55VM STRAIGHT MAST FORKLIFT (A51406)
HYSTER H55VM...
2006 CHEVROLET SILVERADO 4X4 PICKUP TRUCK (A52141)
2006 CHEVROLET...
KIDS DIRT BIKE (A55758)
KIDS DIRT BIKE...
 
Top