Building a covered work area with a 40' span, will this work?

   / Building a covered work area with a 40' span, will this work? #51  
The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

2004 Ford F-250 Liftmoore 2,700 LB 1 Ton Crane Service Truck (A55788)
2004 Ford F-250...
2005 Ford Explorer 4X4 SUV (A53424)
2005 Ford Explorer...
2025 Kivel 48in Forks and Frame Skid Steer Attachment (A55787)
2025 Kivel 48in...
2013 Club Car Carryall 252 Electric Utility Cart (A51694)
2013 Club Car...
JOHN DEERE 7300 LOT NUMBER 18 (A53084)
JOHN DEERE 7300...
2015 Ford F-350 Utility Flatbed Truck (A51692)
2015 Ford F-350...
 
Top