Weird weather this year. May has always been warm (70-85) but we had snow several times this year, including Memorial Day.
Last few days have been more like normal, so time to work on porch/deck.
It’s a DTT2Z tension tie. The engineer calls for one on each end of the deck. It requires a through bolt (going through the block) vs. the redheads holding the ledger board. Something to do with shearwall.Bo, I was wondering what the extra bracket is for on the far right joist hanger? I don't have a ton of deck experience.
Nice job on the ledger board!!!
It’s a DTT2Z tension tie. The engineer calls for one on each end of the deck. It requires a through bolt (going through the block) vs. the redheads holding the ledger board. Something to do with shearwall.