Another Bridge Project

/ Another Bridge Project #21  
Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

2014 VOLVO A25G OFF ROAD DUMP TRUCK (A65053)
2014 VOLVO A25G...
2024 JOHN DEERE TURF GATOR TX 4X2 UTV (A63276)
2024 JOHN DEERE...
Front Tank Bracket (A64126)
Front Tank Bracket...
2004 53ft. Kingman Dry Van Trailer (A61573)
2004 53ft. Kingman...
2020 Chevrolet Tahoe SUV (A64194)
2020 Chevrolet...
JOHN DEERE Z515E ZTRACK ZERO TURN MOWER (A65054)
JOHN DEERE Z515E...
 
Top