Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

2013 Honda 250 Recon ES ATV (A64557)
2013 Honda 250...
2009 PALFINGER 11 FT SERVICE BODY (A62613)
2009 PALFINGER 11...
2013 VOLVO VNL630 6X4 T/A SLEEPER TRUCK TRACTOR (A67147)
2013 VOLVO VNL630...
2008 Ford E-350 Cargo Van (A61573)
2008 Ford E-350...
LONG 10 WHEEL V-RAKE (A64278)
LONG 10 WHEEL...
2015 Toyota RAV4 SUV (A61574)
2015 Toyota RAV4...
 
Top