Yet another pole barn build

/ Yet another pole barn build
  • Thread Starter
#64  
So happy that you brought us up to date on all that you've done to your barn!!!! It looks really nice.

Thanks Eddie. I just milled up 60 1x10’s to wrap the acq posts. Glad I got a sawmill. I priced it out and it would have cost $1800 for the lumber just to wrap posts. Ridiculous. It took me 5hrs and about 6 logs to get the 60 boards milled.
 
/ Yet another pole barn build
  • Thread Starter
#66  
Got some time to work on the place. After a few months of drying I got to use the boards to wrap the posts. Just me, a table saw, circular saw and nail gun. Figured it out to be about 60 saw cuts per posts. It is very rewarding to take a log from a downed tree, skid it to a landing, mill it up, dry it, and shape it to fit your needs.
Well, enough yakking. Here are the pics so far.

IMG_20210819_175952542.jpg

IMG_20210819_175933683.jpg

IMG_20210819_175908383.jpg

IMG_20210819_094455464.jpg

IMG_20210819_180029102.jpg

IMG_20210819_180018992.jpg

IMG_20210824_114515783.jpg

IMG_20210824_114525723.jpg


Just need to stain it to match the rest and bend up some facia trim for the front above the siding.
 

Attachments

  • IMG_20210819_175952542.jpg
    IMG_20210819_175952542.jpg
    2.1 MB · Views: 156
  • IMG_20210819_175933683.jpg
    IMG_20210819_175933683.jpg
    2.5 MB · Views: 153

Marketplace Items

Case IH 950 Planter (A63688)
Case IH 950...
3098 (A63117)
3098 (A63117)
(4) 25x10-12 4 Wheeler Tires w/Rims (A64127)
(4) 25x10-12 4...
2018 Genie GTH-5519 (A64126)
2018 Genie...
Denyo DCA-600SPK 500kW Sound-Attenuated Diesel Generator (Trailer NOT included) (A63689)
Denyo DCA-600SPK...
2003 Ford E-450 Super Duty Passenger Bus (A61573)
2003 Ford E-450...
 
Top