The walls are 16'. Easier and cheaper to run the conduit under the slab to reach the other side. Will take to much wire to go up a 16' wall then across the trusses and then back down 12' on the other wall. Not a fan of having all that romex exposed.
I went the conduit and up/over route- I would argue much easier to expand and or troubleshoot than buried but to each his own