New workshop/garage

   / New workshop/garage #21  
</font><font color="blue" class="small">( The siding will be t-111.)</font>

I would really like to encourage you to consider Hardipanel siding instead of the T-111 if you are truly talking about the real wood stuff. I have never seen T-111 last more than 5 years before it started swelling from the moisture.

I used the Hardipanel siding on the 28 X 32 garage I added on when we remodeled the house. Hardipanel The difference in price was not that much and it will last longer than I will since it is made of concrete and fibers. For about $2 per sheet you can get it pre-primed and that is cheaper than you can have a primer coat put on it.

My concern was that it didn't seem to be very thick but I took some scraps and tried to beat holes in them with a hammer and was pleasantly surprised at how tough it was.

It won't ever war, crack, split swell, and no bug I have ever heard of will attack concrete.

Bill Tolle
 
   / New workshop/garage
  • Thread Starter
#22  
btolle,

I hear you - - I'll talk to the contractor & see what the extra cost will be. However, I used t-111 when I built my barn, spring 1994. [see attachment] I think it still looks pretty good, 10 years later.
I appreciate the tip - - & I will talk to my builder, but my budget cannot stand much in the way of add ons. I could have gone cheaper with metal siding, I think. But, I wanted the workshop to, more-or-less, match the barn.
 

Attachments

  • 524171-Sunrise  Barn 11-16-02 2.JPG
    524171-Sunrise Barn 11-16-02 2.JPG
    37.8 KB · Views: 577
   / New workshop/garage #23  
<font color="blue">( btolle,
I could have gone cheaper with metal siding, I think. But, I wanted the workshop to, more-or-less, match the barn.</font>

My house is 1 X 12 board and batten and I wanted the garage to match the house so I bought the Hardipanel that is called "Cedarmill" and then put 1 X 2 cedar battens on top of it. For me it saved money because it was cheaper than cedar. You can't tell the difference even in the areas where the garage meets the house.

They have a panel called "Sierra 8" that matches T-111 so that would take care of the matching part.

One note: I called the manufacturer about the best way to cut it and they recommended a very coarse carbide blade in a circular saw. They said the further apart the teeth were on the sawblade the more chance the blade had to cool. They have some installation information at Hardipanel install info

I just bought the cheapest carbide tipped coarse blade I could find and threw it away when it was over. Also, put some duct tape on the "shoe" on the circular saw so it won't scratch the shoe up. And be sure to wear a dust mask, it is messy to cut but a great product.

We used a nail gun with #6 nails to install it and had no problems nailing it on.

You can sort of see the garage in the pictures at Bill and Charlotte's Home

Good luck and don't forget the pics!

Bill Tolle
 
   / New workshop/garage #24  
I'll echo others thoughts of strongly considering the Hardi-panel.
I believe it comes with a 50 year warrantee against pretty much anything. Also, it's fireproof.
I used it on all my buildings. One is 7 years old and looks like the day I built it.
Not sure what T-111 costs nowadays, but the Hardi-panel may be the same price. I'm thinking it's around $21/sheet.

Shop is looking real good!!!
 
   / New workshop/garage
  • Thread Starter
#25  
Nov. 5 Well they finished truss construction yesterday - - with that done they made great progress today. He had a 3rd worker on hand today to help with setting the trusses. They did it all by hand - - no crane or FEL. That surprised me.

Here's the 1st truss set on the girders.
 

Attachments

  • 525247-1st truss set on girders.JPG
    525247-1st truss set on girders.JPG
    53.6 KB · Views: 421
   / New workshop/garage
  • Thread Starter
#26  
Next they rotate the truss up 90 degrees & prop it there. Look carefully - - the perspective makes it difficult to see it, but the truss is propped in a horizonal position in this photo.
 

Attachments

  • 525250-Rotate 1st truss 90 degrees.JPG
    525250-Rotate 1st truss 90 degrees.JPG
    55.6 KB · Views: 411
   / New workshop/garage
  • Thread Starter
#27  
Finally, they rotate the truss upright by just working it up a bit at a time. The have a 10' ladder in the middle & 8' ladders on each end. It sounds pedestrian, but it works.
 

Attachments

  • 525251-1st truss upright.JPG
    525251-1st truss upright.JPG
    59.7 KB · Views: 349
   / New workshop/garage
  • Thread Starter
#28  
All eleven trusses in place by noon.
 

Attachments

  • 525252-All trusses set in place.JPG
    525252-All trusses set in place.JPG
    46 KB · Views: 393
   / New workshop/garage
  • Thread Starter
#29  
The rest of the day was spent installing nailing girts, shown here.

I expect they will have the metal roofing on by the middle of next week.

What I'm missing out on by not building this myself, I'm making up for in speed of construction. They are doing a good job & moving quickly.
 

Attachments

  • 525256-Nailing girts installed.JPG
    525256-Nailing girts installed.JPG
    49.6 KB · Views: 391
   / New workshop/garage #30  
Looking good. You gotta be getting real excited now that the trusses are on. From this point forward I think the time will pass quickly for you. Keep the photos coming. Gerard
 
   / New workshop/garage
  • Thread Starter
#31  
Nov 8. Spent morning & into afternoon installing purlins for the roofing panels.

Looking back on all these photos, I'm sorry I did not set a specific spot & take all the pictures from there. But I'm jumping from place to place like a kid on Christmas morning. The crew doing all the work have been pretty tolerant of me, thank goodness.
 

Attachments

  • 526567-Install purlins.jpg
    526567-Install purlins.jpg
    89.6 KB · Views: 378
   / New workshop/garage
  • Thread Starter
#32  
Nov 8. Start installing metal roofing about 3 PM.
 

Attachments

  • 526571-Start Metal Roofing.jpg
    526571-Start Metal Roofing.jpg
    84.8 KB · Views: 345
   / New workshop/garage
  • Thread Starter
#33  
One more shot of start of roofing - - this one a little further away.
 

Attachments

  • 526573-View from pasture.jpg
    526573-View from pasture.jpg
    80.8 KB · Views: 322
   / New workshop/garage
  • Thread Starter
#34  
Nov 10 8 AM. Roof almost finished.
 

Attachments

  • 527719-Nov 10 - 8 AM  Roof almost finished..jpg
    527719-Nov 10 - 8 AM Roof almost finished..jpg
    80 KB · Views: 328
   / New workshop/garage
  • Thread Starter
#35  
Nov 10 3 PM. Roof finished. Just in time - - started to rain within the hour.
 

Attachments

  • 527721-Nov 10 - 3 PM  Finished Roof jpg.jpg
    527721-Nov 10 - 3 PM Finished Roof jpg.jpg
    68.8 KB · Views: 374
   / New workshop/garage #36  
Looking better everyday. Looks like things are going pretty smooth on this project. Before you know it, you'll be in there waxing that tractor /forums/images/graemlins/grin.gif. Gerard
 
   / New workshop/garage
  • Thread Starter
#37  
Nov 11. Started and finished siding. This crew works together exttemely well. They have 1 or 2 guys on ladders, as needed, & a 3rd cutting & fetching for them. Using air framers, the siding went on quickly.
 

Attachments

  • 528830-Start siding.jpg
    528830-Start siding.jpg
    72.8 KB · Views: 339
   / New workshop/garage
  • Thread Starter
#38  
Nov 11, end of day - - Siding is complete.
 

Attachments

  • 528832-Siding complete.jpg
    528832-Siding complete.jpg
    65.4 KB · Views: 319
   / New workshop/garage
  • Thread Starter
#39  
Nov 12. Today the crew worked a half day. They spent most of their time putting up 1x4" trim around the edges & corners.

After they left to start their weekend, I moved the BX into its new digs for its 1st overnight visit. Looks like I should have bought a bigger tractor.
 

Attachments

  • 528834-1st overnight visit.jpg
    528834-1st overnight visit.jpg
    49.9 KB · Views: 384
   / New workshop/garage #40  
</font><font color="blue" class="small">( Looks like I should have bought a bigger tractor. )</font>

Yes, it kind of looks like a little mouse sitting in there, but you will fill the space in around it, no doubt.

Cliff
 

Tractor & Equipment Auctions

2021 CAT 304E2 (A53317)
2021 CAT 304E2...
2008 CATERPILLAR D8T HIGH TRACK CRAWLER DOZER (A60429)
2008 CATERPILLAR...
Honda UTV (A56859)
Honda UTV (A56859)
Toro hr:2213.5 (A56859)
Toro hr:2213.5...
2015 Ford Explorer AWD SUV (A59231)
2015 Ford Explorer...
PowerBoss Admiral Plus 38C Ride-On Floor Scrubber/Sweeper (A59228)
PowerBoss Admiral...
 
Top