Thx, getting there and getting excited
 
   / New shop started #15  
If you don't mind me asking, what do you think youll have into it when complete? Ill be doing all my own work, and have a 40x60x16 planned out and looks like I can get it done for around 35k. But its a red iron kit, you're going ultra fancy.
 
   / New shop started
  • Thread Starter
#16  
2000 cu yards of fill and foundation/grading is about 80k
material was around 125k
electric and service is about 25k (300 ft run from pole, trenching etc) ton of 6awg cable in shops for 3phase etc so pricy
builder/labors/subs etc 100k
 
   / New shop started #17  
Sounds like your pricing is on par with building a house. Of course, you will have a shop nicer then most houses!!!!
 
   / New shop started #18  
Speaking of home building... the school fees for new construction are assessed at $21 a square foot... adds up fast.

The last time I ran a shop design by plan review the planner said no as it looked too much like a home and I was installing a toilet... so it was a no go.
 
   / New shop started
  • Thread Starter
#20  
Upper shop
20160731_084743_zps3lmqwl1c.jpg

Lower level
20160731_084830_zpsfv6cvuaa.jpg
windows in. U can start to see a hint of the color we chose.
20160804_140659_zps22uivrvj.jpg
 

Tractor & Equipment Auctions

New Holland 451 Sickle Bar Mower (A50515)
New Holland 451...
2013 VERMEER RTX1250 RIDE ON TRACTOR (A51242)
2013 VERMEER...
UNUSED FUTURE MINI SKID STEER HYD 4IN1 BUCKET (A51244)
UNUSED FUTURE MINI...
UNUSED AGT KRW23 WHEEL LOADER (A51243)
UNUSED AGT KRW23...
2016 JLG ECOLIFT 70 SELF PROPELLED MANLIFT (A51242)
2016 JLG ECOLIFT...
2008 Genie S-65 65ft Articulating Boom Lift (A50322)
2008 Genie S-65...
 
Top