bakerg
Super Star Member
Good morning, 68F heading to 81F with rain on the way. Prepping the back deck for staining but looks like temperature are dropping into the 50s after today so it looks like no staining until next weekend.
I actually have the paperwork for the permit and I may go after that option real soon I basically just wanted a framed in building and I would do the electrical and hang the garage door myself....We shall see here in the next week or so how it all plays out.B7510HSD wrote "Thanks guys for the congrats..I have a lot of little things I would like to get done but I need to get a garage built first and it seems out of the 6 calls I have made to contractors only 2 have returned them and 1 so far has given me a bid. They are all about 2 months out it seems. Guess they don't need the work if I had the cement work done I would build the rest myself I'm not a cement man by any means..."
I had the same experience last year when I went looking for a surveyor, and before that when I searched for a concrete contractor. I figured that the ones that don't call back are doing me a favor by weeding themselves out before they become a PITA on the job. And that business must be very good if they can't even find time to return a phone call.
Speaking of which, have you considered hiring a concrete man and doing the rest yourself? I bet there are plans available to get you through the permit process (if there is one), probably just a google search away...
