Grading Considering an upgrade

   / Considering an upgrade #21  
One of my partime gigs is clearing mesquite with a large frame skid loader and a sheepsfoot grubber. A few years ago I grubbed 34 acres of small to medium sized mesquite for a customer. Then I built a rake for the skid (similar to a rake you would see on a dozer but smaller, about 3" between tines) and raked the mesquites into windrows then into piles for later burning. I charged the guy $8000 to do this work. As I remember, It took me about 30 days to do the work.

There is a rather long thread that I started describing this project from beginning to end. It is in the owning/operating forum under What price for grubbing mesquite?

I would be very careful about grubbing with a front end loader on a tractor. It would be easy to spring the loader arms. On a skid loader the arms are down against solid stops when I engage the tree. Also the arms on the skid are much more robust than on the typical farm tractor FEL.

Tim
 

Tractor & Equipment Auctions

2016 PETERBILT 587 (A50854)
2016 PETERBILT 587...
2018 CATERPILLAR 289D SKID STEER (A51242)
2018 CATERPILLAR...
Land Honor Skid Steer Bale Spears (A50515)
Land Honor Skid...
(10) 24' CORRAL PANELS (A51243)
(10) 24' CORRAL...
2012 Volkswagen Jetta Sedan (A50324)
2012 Volkswagen...
Adams FL24 Fertilizer Conveyor - 24IN Belt, Predator Engine, 2IN Hitch, Refurbished by Manufacturer (A52128)
Adams FL24...
 
Top