I leveled the bank-run gravel (fill) with my 2320 has the guy brought it and packed it the best I could as I was spreading it and while waiting for the next load. After I was done it rained for about 4 weeks total of about 8 inches. When they came in to install the posts there was very little compaction from the truck. My gut tells me to wait. The guy doing the concrete said I would be fine to do it now.
View attachment 217084