AZ ranch

   / AZ ranch
  • Thread Starter
#1,381  
IMG_1345.jpeg


I went ahead and put perforated drain pipe behind the block I have done so far.
I know, some think I’m nuts for doing the drain pipe when I haven’t even finished the first course yet, but I’ve had multiple cave-ins and I’m just trying to make sure I can get some wall up asap by the most susceptible area to cave.
I even have the apron area to pour yet. That’s the section with all the pieces of rebar.
 
   / AZ ranch #1,383  
I just now found my tool for smoothing the seam between blocks. I may not use it until the 5th course as everything below that will be covered in dirt, inside and out.
A small kitchen spoon works good as well.
You know you’ll misplace it again before course 5!!
 
   / AZ ranch
  • Thread Starter
#1,390  
About 12 block a day is what my back will tolerate. Then there’s tarring the outside and hauling/washing gravel for backfill, grinding and placing rebar, etc. The actual laying of block is about 25% of the job, so I’m happy with the progress rate.
 

Tractor & Equipment Auctions

2014 Ford Taurus AWD Sedan (A54815)
2014 Ford Taurus...
2019 JGL 2632ES 26ft Electric Scissor Lift (A50322)
2019 JGL 2632ES...
2018 Toro Workman GTX Electric Utility Cart (A51694)
2018 Toro Workman...
2015 Volvo VNL 64T (A55302)
2015 Volvo VNL 64T...
Transfer Pump (A53316)
Transfer Pump (A53316)
2007 International 4300 (A53314)
2007 International...
 
Top