Meadowlark,

Great project and congratulations on finishing it so quickly. You must have worked on it every day!!!!

I'm sure the ability to get across it year round was more then worth the $200 you spent on it. hahaha

Eddie
 
/ Another Bridge Project
  • Thread Starter
#22  
Eddie,

Thanks and yes I did work on it every day until completion. The location is very vulnerable to wet conditions and hence my window for getting it done was considered to be very short by me.

Remember, the lumber was all "free"....recycled county bridge lumber. All I had to do was move it to my location, which took two days just in itself. If I hadn't recycled it, it would have just gone to waste.

I really enjoyed the project, in spite of 100 deg. temps most days. It was a real challenge to utilize my equipment efficiently to make up for no other labor help. Time will tell if it holds up or not.
 

Marketplace Items

1998 PETERBILT 377 MIDROOF SLEEPER (A58214)
1998 PETERBILT 377...
2015 Ford Transit 150 Cargo Van (A59230)
2015 Ford Transit...
Mini Margaritaville Truck (A55853)
Mini...
2001 Crosley 20FT T/A Flatbed Equipment Trailer (A59230)
2001 Crosley 20FT...
1989 AM General M998 HMMWV 4x4 Humvee Truck (A59230)
1989 AM General...
2019 CHEVROLET SILVERADO CREW CAB TRUCK (A59823)
2019 CHEVROLET...
 
Top