SHOP ALMOST DONE

/ SHOP ALMOST DONE #1  

AGGIE00

Gold Member
Joined
May 9, 2010
Messages
465
We poured the slab of our 50x75x16 with 25x75 lean to last December and after lots of waiting, the building erector has almost finished.
 

Attachments

  • SLAB POUR.jpg
    SLAB POUR.jpg
    83.1 KB · Views: 136
  • SHOP 1.jpg
    SHOP 1.jpg
    263.4 KB · Views: 156
  • SHOP 2.jpg
    SHOP 2.jpg
    347.6 KB · Views: 162
/ SHOP ALMOST DONE
  • Thread Starter
#2  
And a fitting picture.
 

Attachments

  • shop 3.jpg
    shop 3.jpg
    308.7 KB · Views: 155

Marketplace Items

66'' BUCKET WITH TEETH (A61567)
66'' BUCKET WITH...
2016 WEILER P385A ASPHALT PAVER (A62129)
2016 WEILER P385A...
PRIME 8312 BOX (A63291)
PRIME 8312 BOX...
2015 Ford Transit 250 Cargo Van (A61573)
2015 Ford Transit...
2016 CATERPILLAR TL1055D TELESCOPIC FORKLIFT (A64279)
2016 CATERPILLAR...
Kubota M125X (A60462)
Kubota M125X (A60462)
 
Top