Second project( tooth bar)

/ Second project( tooth bar)
  • Thread Starter
#12  
The tooth bar is bolted in on the sides, I'll try to give you a link to Fabco, I hope it works! [url=http://www.fabco-inc.com
 
/ Second project( tooth bar) #13  
Thanks for the link Jim and Jan Now that the hooks are on the bucket teeth will be the next project...or was that after the weight box??? /forums/images/graemlins/wink.gif

Lou
 

Marketplace Items

500 BBL WHEELED FRAC TANK (A58214)
500 BBL WHEELED...
2019 BOBCAT MT55 WALK BEHIND SKID STEER (A59823)
2019 BOBCAT MT55...
2021 Deere 333G (A53317)
2021 Deere 333G...
2003 IC Corporation 3000IC School Bus (A59230)
2003 IC...
2023 TAKEUCHI TL8R2 SKID STEER (A62129)
2023 TAKEUCHI...
2019 Dodge Charger Sedan (A59231)
2019 Dodge Charger...
 
Top