So, I'll try to share what I've found out; not priceing stuff for me; but discussing this morning while on a work job, and a mobile home dealer was there, and figured I'd ask him.
I mentioned my assumption of $15k well, $25k septic, and $7-9k for culvert, mitered ends, and concrete apron.
He said, the well, he sees wildly varying, and couldn't really give a ball park, because of depth, any post treatment, ect
Septic; he said for a non-raised, very standard system; he is running around $9k. Which I though was very good; but he said he had a system recently that required an aeration system was right around $25k total.
He also said he was getting quotes of around $5.5k on a 15" CMP, 24 ft long, and a 5 ft concrete apron on a county road. What I'm seeing is the $7-9k for 32 ft 18" CMP, with the concrete apron.
I mentioned my assumption of $15k well, $25k septic, and $7-9k for culvert, mitered ends, and concrete apron.
He said, the well, he sees wildly varying, and couldn't really give a ball park, because of depth, any post treatment, ect
Septic; he said for a non-raised, very standard system; he is running around $9k. Which I though was very good; but he said he had a system recently that required an aeration system was right around $25k total.
He also said he was getting quotes of around $5.5k on a 15" CMP, 24 ft long, and a 5 ft concrete apron on a county road. What I'm seeing is the $7-9k for 32 ft 18" CMP, with the concrete apron.