Thanks - this is basically what the builder would like for me to have prepared. Another option for me would be to rototill the sod first, and then scoop it out with the loader. That might be a little easier. After I removed the base sod I would level it out with either the box blade or soil pulverizer.

That's how mine was done. The sod broke down fast and it was much easier to do the finish grade without all the clumps of sod causing problems. You should remove the top 6" of topsoil anyway, that is full of grass roots that will degrade and cause concrete settling problems.
 

Marketplace Items

2015 FREIGHTLINER M2 24FT REFRIGERATED CDL REQUIRED BOX TRUCK (A59914)
2015 FREIGHTLINER...
Eagle Weather Vane (A64127)
Eagle Weather Vane...
2013 HINO 338 26FT BOX TRUCK (A59905)
2013 HINO 338 26FT...
Case 950 8 Row Air Planter (A63118)
Case 950 8 Row Air...
2022 JCB 509-42 TELESCOPIC FORKLIFT (A65053)
2022 JCB 509-42...
2013 PETERBILT 367 (A65643)
2013 PETERBILT 367...
 
Top