54°F and cloudy this morning, going up to 66° today. Expecting some potentially rough storms again tonight.
Lowe's came out on Friday and did their pre-con walk-through and inventory. They found that they didn't have enough of several items. There is only enough hardwood flooring to complete the kitchen and hallway, and a small part of the living room. So, essentially half of what is needed. They only have about 3/4 of the backsplash tile needed for the kitchen. The three interior doors are all the wrong width, and the flooring bullnose edging for the stairwell was not ordered at all. This does not inspire great confidence.
On the brighter side, they brought a different contractor to do the work. The last guy boogered up most of the measurements, obviously. We've already had to have our electrician come back and move a switch box on the kitchen wall because their design would have had it behind the stove. Now we find that they didn't order enough materials. I'm left wondering if the new cabinets and countertop will even fit at this point.
Frustrating, and probably better that I'm at work while they are there. I don't handle incompetence very well, especially when it comes at the cost of five figures.
We had a decent weekend, temperature-wise, and got a lot of little things knocked off of the honey-do list.