Dig septic bed with front end loader

   / Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
   / Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Tractor & Equipment Auctions

MULTIQUIP WHISPERWATT MQ POWER 25 GENERATOR (A52706)
MULTIQUIP...
OLIVER DAHLMAN LOT NUMBER 244 (A53084)
OLIVER DAHLMAN LOT...
HEAVY DUTY JACK (A54757)
HEAVY DUTY JACK...
2016 CATERPILLAR 336FL EXCAVATOR (A52705)
2016 CATERPILLAR...
2006 STERLING CONCRETE MIXER (A55745)
2006 STERLING...
Electric Mobility Scooter (A54815)
Electric Mobility...
 
Top