Dig septic bed with front end loader

   / Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
   / Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Tractor & Equipment Auctions

MANTLE & CHIMNEY FOR FIREPLACE (A58374)
MANTLE & CHIMNEY...
2006 Tusk 500 PG-16 Forklift  3-Stage 188in Lift with Aux Hydraulics (A56435)
2006 Tusk 500...
1977 Ford F-100 Super Cab Pickup Truck (A56858)
1977 Ford F-100...
2017 Nissan Pathfinder SUV (A56859)
2017 Nissan...
2020 DRAGON ESP 150BBL ALUMINUM (A58214)
2020 DRAGON ESP...
1998 Caterpillar 12H Articulated Motor Grader (A55973)
1998 Caterpillar...
 
Top