Dig septic bed with front end loader

/ Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
/ Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Marketplace Items

Zero Turn Mower (A59231)
Zero Turn Mower...
Massey Ferguson 4710 (A60462)
Massey Ferguson...
2015 MACK GU713 DUMP TRUCK (A59823)
2015 MACK GU713...
500 BBL FRAC TANK (A58214)
500 BBL FRAC TANK...
2007 Heil Heavy Duty Aluminum Tank Trailer (A61307)
2007 Heil Heavy...
2011 Chevrolet Impala Sedan (A59231)
2011 Chevrolet...
 
Top