Dig septic bed with front end loader

/ Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
/ Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Marketplace Items

4004SFL (A59228)
4004SFL (A59228)
XCMG CV83PD (A53317)
XCMG CV83PD (A53317)
2007 PETERBILT FLAT TOP SLEEPER  385 (A60736)
2007 PETERBILT...
2008 Mercury 25HP 3-Cylinder Boat Motor (A59231)
2008 Mercury 25HP...
KUBOTA SSV65 OPEN STATION CAB (A52706)
KUBOTA SSV65 OPEN...
2019 VERMEER LP573 XDT VACUUM TRAILER (A59823)
2019 VERMEER LP573...
 
Top