Dig septic bed with front end loader

/ Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
/ Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Marketplace Items

2023 CATERPILLAR 304 EXCAVATOR (A62129)
2023 CATERPILLAR...
Kubota M1048A Forks (A60462)
Kubota M1048A...
CFG Inudustrial MH12RX (A60463)
CFG Inudustrial...
Giyi GY-TB47 Telescopic Forklift Boom (A60463)
Giyi GY-TB47...
TORO GREENS MOWER (A56857)
TORO GREENS MOWER...
HYUNDAI HLF25-5 STRAIGHT MAST FORKLIFT (A59823)
HYUNDAI HLF25-5...
 
Top