David Neisen

/ David Neisen
  • Thread Starter
#11  
No problem with the RANT, you are spot on. Congratulations for the future plans! Unfortunately, you left me no crumbs in figuring out how to post a question.... so this forum or this link is basically useless to me.
 
/ David Neisen
  • Thread Starter
#12  
Thank you much for the suggestion. I will do that here and again. (BTW: There is no such button anywhere above, so I may need to do more 'responses' before I get to post). So here we go.....

I have purchased acreage to build a final home. On my very clayey till, level site near a stand of trees, the previous owner had dug two 13' diameter pits, each 10' deep. I don't know why. Apparently he did not get a permit to do what he wanted, and he then refilled in both pits with the same hard clayey till, he dug out - except for a pile of boulders and stones left in a pile on the side. My QUESTION IS... both piles have settled an inch or two from the level of grade - How long will these pits need to completely settle so I can build on them? Is there a way to speed up that settling? Thanks.
 

Marketplace Items

2015 Goose Neck Cattle Trailer (A53317)
2015 Goose Neck...
2020 INTERNATIONAL MV607 REEFER BOX TRUCK (A55745)
2020 INTERNATIONAL...
2024 CATERPILLAR 305 CR EXCAVATOR (A52709)
2024 CATERPILLAR...
SKIDDED FRAC TANK (A58214)
SKIDDED FRAC TANK...
72" ROCK BUCKET (A52706)
72" ROCK BUCKET...
Kubota B21 TLB (A60462)
Kubota B21 TLB...
 
Top