Covered Slab Slope

/ Covered Slab Slope #21  
If you have slope away from house, you do not need a step between porch and house.
Make sure existing concrete is clean and use bonding agent when placing topping slab
 
/ Covered Slab Slope #22  
1% to 2% is standard IBC (International Building Code) for all civil grades exposed to wind driven rain for drainage. Depending on the expanse of your flatwork, 1% is a hard slope to hit with finish work, without the likelihood of puddles, due to the fact that it is so gradual. In Portland Oregon, where I work doing heavy commercial construction, 2% is the industry standard. Whoever commented that 2% is too steep, has obviously never walked on a sidewalk or patio in the Pacific Northwest.
 
/ Covered Slab Slope #23  
The problem (besides drainage and code) with less than 1/4" - you risk some bird baths. With the size of your slab you may get away with it. It depends on your screed board, form work, concrete application and the finisher you hire.
 

Marketplace Items

2018 CATERPILLAR 573D FELLER BUNCHER (A62129)
2018 CATERPILLAR...
2015 FORD F-150 LARIAT CREW CAB TRUCK (A63276)
2015 FORD F-150...
2003 International 4300 Flatbed Dump 571559 (A62613)
2003 International...
JOHN DEERE 300P EXCAVATOR (A65053)
JOHN DEERE 300P...
2020 KENWORTH T680 6X4 T/A  SLEEPER  TRUCK TRACTOR (A59914)
2020 KENWORTH T680...
2015 FREIGHTLINER M2 4X2 S/A 26FT REFRIGERATED BOX TRUCK (A59914)
2015 FREIGHTLINER...
 
Top