Covered Slab Slope

/ Covered Slab Slope #21  
If you have slope away from house, you do not need a step between porch and house.
Make sure existing concrete is clean and use bonding agent when placing topping slab
 
/ Covered Slab Slope #22  
1% to 2% is standard IBC (International Building Code) for all civil grades exposed to wind driven rain for drainage. Depending on the expanse of your flatwork, 1% is a hard slope to hit with finish work, without the likelihood of puddles, due to the fact that it is so gradual. In Portland Oregon, where I work doing heavy commercial construction, 2% is the industry standard. Whoever commented that 2% is too steep, has obviously never walked on a sidewalk or patio in the Pacific Northwest.
 
/ Covered Slab Slope #23  
The problem (besides drainage and code) with less than 1/4" - you risk some bird baths. With the size of your slab you may get away with it. It depends on your screed board, form work, concrete application and the finisher you hire.
 

Marketplace Items

UNUSED INDUSTRIAS AMERICA HYD POST PULLER (A60430)
UNUSED INDUSTRIAS...
YALE VERACITOR 50VX STRAIGHT MAST FORKLIFT (A63276)
YALE VERACITOR...
2016 Eager Beaver 20XPT 27ft 25 Ton T/A Flatbed Equipment Trailer (A61572)
2016 Eager Beaver...
Land honor Mini Skid Steer (A60352)
Land honor Mini...
2005 Peterbilt 378 Day Cab w/ Wetline 834826 (A62613)
2005 Peterbilt 378...
2019 ATLAS COPCO QAS 25 T4F NB-3 PHASE GENERATOR (A60429)
2019 ATLAS COPCO...
 
Top