When my grader was finished cutting into the bank to level a pad, the sloped portion has a pretty sharp edge/cliff. Seems pretty simple to take a rake and just contour the top of the slop, and blend it in with the angle of the bank as best as possible. Am I overthinking this, or is the crest necessary to help with erosion? I have a 6ft wide swale between the bank and the building, so water shouldn't be an issue.

