Building a pond questions

   / Building a pond questions #51  
Soil Conservation evaluated the pond site for sutability, marked the expected water line and designed my dam. They also sized the overflow pipe and the spillway. All for free. It utilized 3700 cu yds just in the dam. Three of the four contractors asked for a copy of the design doc to do their bid. One said "I don't need to know that info." No he was not a season contractor. Guess who I did not use. Took most of a month to build and about 4 months to fill. The estimate is 5 million gallons in about 2.75 acres.
 
   / Building a pond questions #52  
I'm not sure what say the state would have in a USDA funded EQUIP program. I wasn't approached about public use, but had he, you can bet I'd have told him where to stick his riser. /forums/images/graemlins/laugh.gif
 

Tractor & Equipment Auctions

2009 Peterbilt 335 Cab and Chassis Truck (A55852)
2009 Peterbilt 335...
CATERPILLAR 305 CR EXCAVATOR (A52709)
CATERPILLAR 305 CR...
2019 Chevrolet Silverado 1500 Pickup Truck (A55973)
2019 Chevrolet...
1974 Ford F600 Grain Truck (A56438)
1974 Ford F600...
2003 PETERBUILT PB330 DUMP TRUCK (A58375)
2003 PETERBUILT...
Bulk Lot of NEW Motorcycle Control Cables - Motion Pro & Biker's Choice (A56438)
Bulk Lot of NEW...
 
Top