Building a pond questions

   / Building a pond questions #51  
Soil Conservation evaluated the pond site for sutability, marked the expected water line and designed my dam. They also sized the overflow pipe and the spillway. All for free. It utilized 3700 cu yds just in the dam. Three of the four contractors asked for a copy of the design doc to do their bid. One said "I don't need to know that info." No he was not a season contractor. Guess who I did not use. Took most of a month to build and about 4 months to fill. The estimate is 5 million gallons in about 2.75 acres.
 
   / Building a pond questions #52  
I'm not sure what say the state would have in a USDA funded EQUIP program. I wasn't approached about public use, but had he, you can bet I'd have told him where to stick his riser. /forums/images/graemlins/laugh.gif
 

Tractor & Equipment Auctions

2015 Freightliner M2 106 AWD Altec AT37G 37ft. Insulated Bucket Truck (A60460)
2015 Freightliner...
2017 CATERPILLAR 120M2 MOTORGRADER (A59823)
2017 CATERPILLAR...
iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A55851)
iDrive TDS-2010H...
2008 JCB 190 ROBOT SKID STEER (A60429)
2008 JCB 190 ROBOT...
2005 PETERBILT 379 TRI AXLE  DUMP TRUCK (A59575)
2005 PETERBILT 379...
RING 2 STARTS HERE @ 9:15 AM (A60430)
RING 2 STARTS HERE...
 
Top