Soil Conservation evaluated the pond site for sutability, marked the expected water line and designed my dam. They also sized the overflow pipe and the spillway. All for free. It utilized 3700 cu yds just in the dam. Three of the four contractors asked for a copy of the design doc to do their bid. One said "I don't need to know that info." No he was not a season contractor. Guess who I did not use. Took most of a month to build and about 4 months to fill. The estimate is 5 million gallons in about 2.75 acres.
 
   / Building a pond questions #52  
I'm not sure what say the state would have in a USDA funded EQUIP program. I wasn't approached about public use, but had he, you can bet I'd have told him where to stick his riser. /forums/images/graemlins/laugh.gif
 

Tractor & Equipment Auctions

DEUTZ MARATHON 60KW GENERATOR (A58214)
DEUTZ MARATHON...
2008 TEXAS BRAGG 20 UTILITY TRAILER (A55745)
2008 TEXAS BRAGG...
2020 McLanahan 150 TPH USP Sand Plant (A55973)
2020 McLanahan 150...
2017 BOBCAT T770 SKID STEER (A52709)
2017 BOBCAT T770...
2022 Brush Wolf ALPHA-XP Skid Loader Brush Cutter (A56435)
2022 Brush Wolf...
2020 CATERPILLAR D5 LGP HIGH TRACK CRAWLER DOZER (A52709)
2020 CATERPILLAR...
 
Top