Building a pond questions

   / Building a pond questions #51  
Soil Conservation evaluated the pond site for sutability, marked the expected water line and designed my dam. They also sized the overflow pipe and the spillway. All for free. It utilized 3700 cu yds just in the dam. Three of the four contractors asked for a copy of the design doc to do their bid. One said "I don't need to know that info." No he was not a season contractor. Guess who I did not use. Took most of a month to build and about 4 months to fill. The estimate is 5 million gallons in about 2.75 acres.
 
   / Building a pond questions #52  
I'm not sure what say the state would have in a USDA funded EQUIP program. I wasn't approached about public use, but had he, you can bet I'd have told him where to stick his riser. /forums/images/graemlins/laugh.gif
 

Tractor & Equipment Auctions

2019 ALLMAND BROS, INC. ALLMAND BROS, INC. (A55745)
2019 ALLMAND BROS...
Electric tri scooter irgc40 (A56859)
Electric tri...
2004 Fleetwood Wilderness Advantage 365 BSQS 38FT T/A 5th Wheel Travel Trailer (A56859)
2004 Fleetwood...
2003 International 9200I (A53317)
2003 International...
FORD F SERIES DUMP TRUCK (A52707)
FORD F SERIES DUMP...
2013 Ford Taurus Sedan (A56859)
2013 Ford Taurus...
 
Top