I got lucky on mine. Grizzly tools is not too far away and had a parking lot sale. I got the one in the picture above for about $500, it was a showroom display. They had tons of tools for very reasonable, typically 30-40% off. It's got a 6" max height but you can get a 4" extender/spacer to up that to a 10" cut height. I've been looking at blades, when I get some I'll make a similar cut and time it.
 
   / Beekeeping #362  
I got lucky on mine. Grizzly tools is not too far away and had a parking lot sale. I got the one in the picture above for about $500, it was a showroom display. They had tons of tools for very reasonable, typically 30-40% off. It's got a 6" max height but you can get a 4" extender/spacer to up that to a 10" cut height. I've been looking at blades, when I get some I'll make a similar cut and time it.

Sounds like a heck of a deal. It took me 6 hours in total to make these pieces. About 3.5 of that was shaping them. Not including the time it took to empty my 35 gallon dust collector 🤣

My guess is I'd save 2 hours by recutting those pieces in a band saw. Saving me about 30 seconds per slat. Or $.15 in labor per slat 🤔
 
   / Beekeeping #364  
I love woodworking. I now have about 400 pieces cut for frames, and about 150 to go.
Cutting the top bars for the frames required some saw tuning. I'm using 1x10s (9.25 wide), and cutting (7) 1.5" wide bars from each length. That leaves less than 1/16 of an inch of scrap. Well, if the fence is say .020 out of alignment, that doesn't make much of a difference on a single cut. Stack that over 6 cuts, and now it's a problem when you only have 1/16" to play with.
Did some quick aligning and have it within .005" now. This is the scrap left after cutting (7) top bars from a 9.25" wide board 🤯

IMG20240924205129.jpg
 
   / Beekeeping #365  
I picked up that same table saw when building our house. It's capable and enjoyable to use.

Builder had his table saw, I had mine, plus we each had separate miter saws.

With 56 windows and 20 doors to custom cut the casings, sills and face trim...we could both be cutting and not get in each other's way.

Like you said, woodworking has its own rewards...it is easy to get into flow when working on a project...
 
   / Beekeeping #366  
Drilled 300 frame pieces for wiring... That took about 2.5 hours. It's going to take, my estimate, 27 hours to build 150 frames, start to finish. So, about 10 days of tinkering in the shop.
IMG20240929203832.jpg
IMG20240929203836.jpg
IMG20240929203846.jpg
 
   / Beekeeping #367  
Sounds like you have started a new company and you're going to be making a lot of these. Building jigs for things like drilling several at a time will speed up the process

How much time does it take to buy all the materials? That's the silent killer in my line of work. When I bid a remodel, I have to figure out how much of that time will be at the stores, and just driving to the stores to buy stuff eats up time in a job

Will you be selling them from a website?
 
   / Beekeeping #368  
Sounds like you have started a new company and you're going to be making a lot of these. Building jigs for things like drilling several at a time will speed up the process

How much time does it take to buy all the materials? That's the silent killer in my line of work. When I bid a remodel, I have to figure out how much of that time will be at the stores, and just driving to the stores to buy stuff eats up time in a job

Will you be selling them from a website?

The materials purchase takes half a day, it is my least favorite part.

Eventually we will have a website up, but this is a pretty slow ramp up. This is all word of mouth advertising.

These are for current orders, not even a stock of parts. 😭
 
   / Beekeeping #370  
Needed to move a full sheet of 3/4" MDF to the horses to cut 3/8" plywood sheets on today , and my helper was busy. Used a couple clamps and straps to lift it to the horses with the loader.
IMG20241002114629~2.jpg
 

Tractor & Equipment Auctions

2014 Ford F-150 Pickup Truck, VIN # 1FTFX1CT2EFB75727 (A48836)
2014 Ford F-150...
TEST BID LOT (A50774)
TEST BID LOT (A50774)
2019 FORD F-650 SUPER DUTY BOX TRUCK (A51406)
2019 FORD F-650...
2018 FREIGHTLINER CASCADIA TANDEM AXLE DAY CAB (A50046)
2018 FREIGHTLINER...
GARDNER DENVER 480 VOLT AIR COMPRESSOR (A50854)
GARDNER DENVER 480...
CATERPILLAR 259D3 SKID STEER (A50458)
CATERPILLAR 259D3...
 
Top