AZ ranch

/ AZ ranch #171  
Here's my latest toy. It was delivered a couple of days ago. :thumbsup:

That's quite the toy! Assuming for loads of block/brick/pavers, roofing, etc?
I really like the loading ramp....:thumbsup::laughing:
 
/ AZ ranch
  • Thread Starter
#173  
Probably a log lifter.

:)

Bruce

You got that right. 99% of the reason I got it was to lift logs. I'm sure I will find a hundred other uses, but log lifting was the reason for the purchase. :thumbsup:
 
/ AZ ranch
  • Thread Starter
#174  
My logger called this morning and said he would be there with the first load of logs on Thursday morning. Woo Hoo! :D
 
/ AZ ranch #175  
You got that right. 99% of the reason I got it was to lift logs. I'm sure I will find a hundred other uses, but log lifting was the reason for the purchase. :thumbsup:

Got it! :thumbsup:
 
/ AZ ranch
  • Thread Starter
#176  
I ordered solar panels today, as well as an inverter, charge controller, and batteries. I have too many projects going on at the same time. I need to retire so I have more time. But then I won't have enough money. :laughing:
 
/ AZ ranch
  • Thread Starter
#177  
On Thursday I received my first load of logs. Woo Hoo! :thumbsup:
 

Attachments

  • IMG_2252.jpg
    IMG_2252.jpg
    1 MB · Views: 529
  • IMG_2263.jpg
    IMG_2263.jpg
    1 MB · Views: 503
Last edited:
/ AZ ranch
  • Thread Starter
#179  
Next thing on the agenda is my stem wall foundation. It needs to be 32 X 32 and go down 3 feet for frost line. A couple locals are trying to talk me into doing a block wall and fill with rebar and concrete, but I really want a poured wall. In fact I would prefer it to be 10 inches or even 12 inches wide even though the plans call for 8.
Then I'm at least 2 hours from the nearest batch plant, so I'm wondering about mixing on site and doing it over several days. I know they can put in retarder to make it last in the delivery truck time, but I also heard that the retarder tends to eat rebar. Any major problems with multiple cold joints?
 
/ AZ ranch #180  
Then I'm at least 2 hours from the nearest batch plant, so I'm wondering about mixing on site and doing it over several days. I know they can put in retarder to make it last in the delivery truck time, but I also heard that the retarder tends to eat rebar. Any major problems with multiple cold joints?

Are there any mobile batch companies around? Their trucks mix the concrete at the site and you only have to pay for what you need.
Rick
 

Marketplace Items

Willmar 4550 Wrangler Articulating Loader (A61307)
Willmar 4550...
2026 tilt trailer (A56859)
2026 tilt trailer...
SD Lanch SDLG80 Electric Golf Cart (A60463)
SD Lanch SDLG80...
2018 INTERNATIONAL LT625 TANDEM AXLE SLEEPER (A59904)
2018 INTERNATIONAL...
LaneShark L53 (A60463)
LaneShark L53 (A60463)
Sdlanch SDLGM1220F (A60463)
Sdlanch SDLGM1220F...
 
Top