We’re done. I didnt prep it too much, the old bucket is pitted a little. Need to drill a couple of weep holes so water doesn’t accumulate. I’m happy with it, its bigger than my first one.
So i have $650 in it. $250 for the bucket, $300 for the adapter, and $50 for steel, and $50 in paint and rods, grinder discs.
It will make graveling these quicker. Gravel pile is out front and i have to bed this with 4” gravel above pipe. Takes forever with a 2’ digging bucket.
I revisit this thread if it cracks. Don’t anticipate that though…