Top and TIlt, additional stress on 3pt attach pts?

   / Top and TIlt, additional stress on 3pt attach pts?
  • Thread Starter
#21  
Just an update...
Got the top and tilt. Have put another 30-40 hours using the box blade and the repair has held up so far.

My dealer said when he saw the repair "I have seen some repairs like that last 20 minutes and some that last 20 years"

He also mentioned that the casting is around 420 plus another 200-350 in labor.

For now I keep running with it and hope for the 20 years.
 

Tractor & Equipment Auctions

Kubota SVL 97-2 (A53317)
Kubota SVL 97-2...
2017 Dodge Ram SLT (A55314)
2017 Dodge Ram SLT...
PALLET OF 15 4 X 8 GROUND PROTECTION MATS (A58214)
PALLET OF 15 4 X 8...
1973 White Trucks Western Star Dump Truck (A57453)
1973 White Trucks...
2006 Mac Truck CXN613 (A56436)
2006 Mac Truck...
(1) HD 24ft Free Standing Corral Panel (A57453)
(1) HD 24ft Free...
 
Top