For the price of a new bridge they could run a pump 24/7Grind the road down too much and they need to add more drainage. So cost goes up pretty quick.
If you'll notice the speed limit sign, it's 70, so it would have to have a very gradual lead in and out for even several inches of drop. Assuming it's an interstate so reducing the speed probably isn't an option.Why can't you just dig the road surface down a few inches?
Hahahaha. The unofficial speed (minimum) limit here during afternoon rush hour is about 82mph across three lanes, competitive racing style. With no shoulder on the left side because MDOT made it a “flex lane”.If you'll notice the speed limit sign, it's 70, so it would have to have a very gradual lead in and out for even several inches of drop. Assuming it's an interstate so reducing the speed probably isn't an option.
Don't think he would fit under a 13' 10" bridge either. Jon