Today, after finishing te holes and adding 2" of #57 stone for drainage, we sunk our first pole.
 

Attachments

  • 799011-IMG_0242 (Small).JPG
    799011-IMG_0242 (Small).JPG
    76.9 KB · Views: 562
/ POLE BARNS RECYCLED
  • Thread Starter
#22  
This is where we were at by lunch.
 

Attachments

  • 799014-IMG_0247 (Small).JPG
    799014-IMG_0247 (Small).JPG
    73.6 KB · Views: 529
/ POLE BARNS RECYCLED
  • Thread Starter
#23  
And here is where we were at by the end of the day. All poles set except for the two for the main door. Not a bad days work. Special thanks to my Dad and brother for their help. I wouldn't have gotten them all in without you.
 

Attachments

  • 799017-IMG_0253 (Small).JPG
    799017-IMG_0253 (Small).JPG
    71.6 KB · Views: 557
/ POLE BARNS RECYCLED
  • Thread Starter
#24  
Well it turns out that the old floor joist that I scavenge from a jobsite weren't all the same height. They ranged from 14"-13" tall. So we ripped them all to 13". It was a slow process, being that I still have the original blade (non-carbide tooth) on my tablesaw. The blade managed to hang in there long enough to rip enough boards for one side. So, here is where it stands after today.
 

Attachments

  • 799396-IMG_0282 (Small).JPG
    799396-IMG_0282 (Small).JPG
    64.8 KB · Views: 605
/ POLE BARNS RECYCLED #25  
Looks like steady progress, keep up the good work! Thanks for the pictures, I like these kind of threads.
 
/ POLE BARNS RECYCLED
  • Thread Starter
#26  
Thanks Chuck. I'm sorry to say that there won't be any progress for a few weeks as I busted some ribs at work last monday. Maybe I can keep things going if all of my help doesn't mind my "supervisor only"status. /forums/images/graemlins/grin.gif
 
/ POLE BARNS RECYCLED #27  
OUCH! /forums/images/graemlins/shocked.gif Sorry to hear about your injury, hope you heal soon! Take it easy and try to stick to the "supervisor" status /forums/images/graemlins/smile.gif

When my son and I built our pole barn, I fell off a ladder and sprained an ankle pretty bad (don't ask how). The next day I somehow managed to get on the roof to nail down some shingles (10 square) before it rained, but man did I pay for it! Lots of Advil and a few beers that night... and the next... and the next /forums/images/graemlins/smile.gif
 
/ POLE BARNS RECYCLED #28  
Sorry to hear about your injury. The barn is looking really good. Thanks for sharing the pictures.

Eddie
 
/ POLE BARNS RECYCLED
  • Thread Starter
#29  
Let's just say I started building this barn under the county's radar and got caught. /forums/images/graemlins/blush.gif Actually I didn't realize I needed a permit for a pole barn but, they set me straight. /forums/images/graemlins/frown.gif No fines they just required I get a permit which was a project in itself. /forums/images/graemlins/grin.gif Anyway, due to the stall, the recycled 2"x13" heart pine floor joist I was going to use started to curl pretty bad, so I had to back up and punt. Since the county is overseeing the project now and the recent stiffening in codes due to hurricanes, I decided to use double 2"x12" notched into the poles an inch and a half.
 

Attachments

  • 853656-IMG_0411 (Small).JPG
    853656-IMG_0411 (Small).JPG
    48.4 KB · Views: 539
/ POLE BARNS RECYCLED
  • Thread Starter
#32  
After the poles were notched the band went up quick
 

Attachments

  • 853663-IMG_0416 (Small).JPG
    853663-IMG_0416 (Small).JPG
    45.8 KB · Views: 449
/ POLE BARNS RECYCLED
  • Thread Starter
#34  
Just a shot of me wrestling a sixteen footer /forums/images/graemlins/grin.gif.
 

Attachments

  • 853667-IMG_0417 (Small).JPG
    853667-IMG_0417 (Small).JPG
    79.1 KB · Views: 503
/ POLE BARNS RECYCLED
  • Thread Starter
#35  
Both sides complete with some additional bracing.
 

Attachments

  • 853672-IMG_0419 (Small).JPG
    853672-IMG_0419 (Small).JPG
    56 KB · Views: 469
/ POLE BARNS RECYCLED
  • Thread Starter
#36  
Changed jobs so using the eqipment I had planned on was out of the question. I had to rent. I thought about hiring a crane service but they had a 3 hr min. for around $400. I rented a Lull for $600.
 

Attachments

  • 853681-IMG_0431 (Small).JPG
    853681-IMG_0431 (Small).JPG
    89.7 KB · Views: 504
/ POLE BARNS RECYCLED
  • Thread Starter
#37  
Here is a shot of the first few trusses set. I know this will probably start saftey discussion, and I am not going to say "don't try this at home" because I am not a professional. I am some one who had 2 days to get the trusses set. I knew the risks.
 

Attachments

  • 853692-IMG_0421 (Small) (2).JPG
    853692-IMG_0421 (Small) (2).JPG
    71.1 KB · Views: 894
/ POLE BARNS RECYCLED
  • Thread Starter
#38  
Here is another shot of the trusses being set.
 

Attachments

  • 853695-IMG_0423 (Small).JPG
    853695-IMG_0423 (Small).JPG
    49.3 KB · Views: 461
/ POLE BARNS RECYCLED
  • Thread Starter
#39  
The Lull also helped me to build this gateway for my dad.
 

Attachments

  • 853698-IMG_0425 (Small).JPG
    853698-IMG_0425 (Small).JPG
    73.3 KB · Views: 505
/ POLE BARNS RECYCLED
  • Thread Starter
#40  
But that is another project. Here is the reason I need this pole barn. What a mess!
 

Attachments

  • 853699-IMG_0422 (Small).JPG
    853699-IMG_0422 (Small).JPG
    93 KB · Views: 598

Marketplace Items

CATERPILLAR 336EL H EXCVATOR (A65053)
CATERPILLAR 336EL...
2020 Chevrolet Traverse SUV (A64557)
2020 Chevrolet...
2017 Chevrolet Impala Sedan (A64194)
2017 Chevrolet...
2005 20 Ft. Grady-White Boat with 25 Ft. Float-On T/A Boat Trailer (A64557)
2005 20 Ft...
UWS TBS-69 Truck Bed Tool Box (A64556)
UWS TBS-69 Truck...
NexTier Frac Manifold T/A Trailer (A64194)
NexTier Frac...
 
Top